Global complianceBuilt to local codes across the Americas, Europe, the Middle East, Africa and Asia-PacificLearn more
SINOWISE
Site assessment

Run it in the twin first: what an airflow simulation catches early

Hot- and cold-aisle temperatures, supply-air temperature and total airflow, visible before deployment.

The twin on our home page uses an old warehouse as its example. Phase 1 has power but no cooling water: rows C and D enclose a contained cold aisle and start with air-cooled racks and in-row coolers. Phase 2 adds side-mounted liquid-to-air CDUs in row B. In phase 3 facility water arrives, and the liquid-cooled racks in row A connect to a facility CDU and outdoor dry coolers.

What the airflow simulation shows

  • In-row supply-air, cold-aisle and hot-aisle temperatures
  • Total airflow
  • Temperature distribution on vertical and horizontal sections

Problems it catches early

  • Hot and cold air mixing, and recirculation, caused by incomplete blanking
  • Whether the number of in-row coolers matches the load
  • New hot spots after an expansion

Beyond design

The same model supports operations drills: automatic leak isolation, fire-system interlock, UPS ride-through during a utility outage, and inserting a new rack into a reserved position.

The figures in the example are simulated, using a simplified airflow model.

Want to see your own site in the twin?

Product Handbook

Get the product handbook

Specifications, selection guidance and delivery scope for the full Rack, Container and Campus range, in one PDF.

Privacy:how we handle the information you submit

Your Site, Simulated

Run your own site in the twin

We'll build a digital twin from these conditions and walk you through it on a video call. Fill in whatever you know.

Site type

Privacy:how we handle the information you submit

Leads

Leads

Contacts from the four forms on the site. Only you and editors can see them, and each submission is also emailed to contact@gpuaidc.com.