Global complianceBuilt to local codes across the Americas, Europe, the Middle East, Africa and Asia-PacificLearn more
SINOWISE
Site assessment

About Sinowise

From server engineering
to AI data centers

SINOWISE designs, builds and delivers AI data centers, from a single rack to a full campus. Its core team comes from a long-established server engineering organization and has worked through the shift from general-purpose to AI computing.

Power density in AI data centers keeps rising, and the building, power, cooling, network and IT equipment all constrain one another. We start from the compute equipment itself and use systems engineering to put every discipline on one engineering baseline, designing, building, integrating and delivering as one.

Digital engineering across six stages

01

Requirements

Turn workloads into verifiable engineering parameters

02

Design

One model for product, production line and campus

03

Simulation

Multiphysics simulation, validation up front

04

Manufacturing

Prefabrication on one engineering baseline

05

Validation

Factory tests and on-site commissioning

06

Operation

Measured data flows back to keep the model calibrated

Product Handbook

Get the product handbook

Specifications, selection guidance and delivery scope for the full Rack, Container and Campus range, in one PDF.

Privacy:how we handle the information you submit

Your Site, Simulated

Run your own site in the twin

We'll build a digital twin from these conditions and walk you through it on a video call. Fill in whatever you know.

Site type

Privacy:how we handle the information you submit

Leads

Leads

Contacts from the four forms on the site. Only you and editors can see them, and each submission is also emailed to contact@gpuaidc.com.