Global Compliance
Compute anywhere,
built to local code
Every SINOWISE project is prepared for the country it runs in: components from the latest NVIDIA approved vendor list (AVL), power matched to the local grid, a planned certification and testing path, and installation documents written to local codes, across North America, Europe, Japan, Southeast Asia, the Middle East, Africa and Latin America. The same process covers racks, containers and campuses.
Select a region on the map to see its local requirements.
What it covers
Compliance isn't paperwork you add at the end. It starts with component selection.
01
AVL-based selection
Key rack, liquid-cooling and power components are selected from the latest NVIDIA AVL and aligned with deployment requirements for platforms such as MGX, B300 and GB300 NVL72.
02
Grid and power distribution
Power distribution, UPS and rack PDUs configured for each market’s voltage class, frequency and grounding.
03
Certification and testing path
Safety, EMC and other certification and testing are planned around each country's market-access requirements, with labs and lead times booked early.
04
International standards and mutual recognition
Built on international standards such as IEC 62368-1 and IEC 61439, using the IECEE CB Scheme (54 member countries) to cut repeat testing from country to country.
05
Installation codes and documents
Drawings, calculations and installation instructions prepared to local electrical, fire and building codes.
06
Efficiency and environmental rules
EU data centers of 500 kW and up report energy KPIs, Germany's Energy Efficiency Act adds PUE and waste-heat rules, and Singapore has a green data center standard; refrigerants are chosen to the F-gas Regulation and similar rules.
07
Shipping, seismic and climate
Sea-freight dimensions, lifting and on-site anchoring plans; seismic anchoring for earthquake-prone markets such as Japan, Turkey and Chile, and extra protection where heat, dust or humidity call for it.
08
Delivery and operations
On-site installation and commissioning, acceptance documents and operations handover, with spares and remote monitoring configured per project.
By region
These are the compliance dimensions we cover; certification scope and status for each product are confirmed in the project documents.
How a project runs, country by country
Market and site assessment
Market-access requirements, grid and site conditions in the target country
AVL selection and design
Specified from the latest NVIDIA AVL, with design documents issued
Certification and testing
Certification, testing and documents arranged to market-access requirements
Factory build and acceptance testing
Prefabricated and integrated, tested before shipping
Shipping, installation and acceptance
Sea freight, lifting, on-site commissioning and handover